Canopy vs. the spreadsheet your planner rebuilds every morning
Most plants plan production in a spreadsheet one person understands, from stock counts that went stale yesterday. This page is an honest comparison: what the spreadsheet is good at, where it breaks, and what Canopy does differently.
What the spreadsheet does well
It is flexible, it is already there, and it holds your planner's real knowledge: which supplier's Thursday means Tuesday, which count on aisle four is wrong, which machine hates a second changeover. Any system that ignores that knowledge fails. Canopy does not ask you to throw it away — it works from the same exports and spreadsheets your plant already runs.
Where it breaks
- It is rebuilt by hand every morning, so the plan is only as current as one person's archaeology across four systems
- Shortages surface at the line, after the job starts, because the BOM was never exploded against inventory as it actually is
- Bad data hides in it: duplicate SKUs, blank lead times, units that mean different things in purchasing and the warehouse
- When the planner is out, the knowledge is out — the spreadsheet's logic lives in one head
- It cannot warn you days ahead; it can only describe the morning someone builds it
What Canopy does instead
Canopy reads your orders, bills of materials, inventory movements, and supplier lead times from the systems you already run — ERP exports included — and hands your planner the day answered before the shift starts: the work orders that can actually run, the parts that are missing with quantities and reasons, the reorders to place sized to lead time and safety stock, and an exception queue for everything it will not guess on. The planner approves or overrides every line, and the overrides are remembered.
The honest summary
A spreadsheet describes the plan one person managed to rebuild. Canopy keeps the picture current on its own, so a shortage is a warning days ahead instead of a stopped line. It does not replace your ERP, and it does not replace your planner. It replaces the rebuild.
Do we have to stop using spreadsheets to use Canopy?
No. Most plants plan from spreadsheets and ERP exports, and Canopy starts there: it reads the exports and spreadsheets you already produce, reconciles them against each other, and returns the answered plan. Your planner keeps working the way planners work — the system recommends, your people decide.
What does Canopy replace in a plant?
The morning rebuild: the spreadsheet, or the ERP report nobody trusts, that your planner rebuilds by hand to learn what can run today. Orders, BOMs, stock, and lead times are checked against each other continuously instead of once a morning by hand.
How is this judged?
On operational measures: shortages surfaced before the line starts rather than after, expedites per week trending down, schedule attainment on the buildable plan, days-cover breaches caught while there is still time to act, and the minutes your planner spends rebuilding the morning plan.