INTEGRATION BUILT ON CANOPY

Production planning with Aspel SAE

Aspel SAE runs the administration of thousands of Mexican manufacturers. The production plan, though, still gets rebuilt in a spreadsheet every morning. Canopy works with SAE the way your plant already works: from its exports.

What Canopy reads from Aspel SAE

SAE exports and reports: inventory by warehouse (Multialmacén), items and their units, movements in and out, purchase and sales documents. Read together with your bills of materials and supplier lead-time notes — wherever those live, including spreadsheets and email — they become one clean picture of materials.

What it returns

  • The buildable schedule: which work orders can actually run today
  • The shortage list, with the exact part, quantity, and reason
  • Reorder drafts sized to lead time and safety stock, ready for your planner to approve
  • An exception queue for BOM lines too uncertain to plan on — duplicates, missing units, blank lead times

What stays in Aspel SAE

SAE remains your system of record for administration and inventory documents. Canopy does not replace it and does not ask for a migration. It adds the planning layer SAE was never built to be — and every action it prepares is approved by your planner before anything is posted.

Does Canopy replace Aspel SAE?

No. SAE stays your administrative and inventory system. Canopy reads its exports, adds structure and analytics on top, and returns the day answered — the buildable plan, the shortages, the reorder drafts. Your planner approves every line.

Our SAE data is messy. Does that block the pilot?

No — messy data is the normal starting point. The first days of a pilot reconcile counts and surface the exceptions: duplicate items, missing units, blank lead times. Those go to a review queue for a person to settle instead of silently corrupting the plan.

How does a pilot with Aspel SAE start?

One plant, one workflow, thirty days. Days 1–5 connect the exports and reconcile counts; days 6–10 run in shadow mode against your planner's spreadsheet; from day 11 the brief runs live with your planner approving every line; day 30 is a scoreboard review and a go / no-go.